海角社区app

Construction Tenders

Fri November 15 2024

Related Information

Construction Contract Leads

No location provided

Category Works

Type

No. of Lots 1

Status Active

Published 9th Oct 2024

Tender Details
Referenceocds-h6vhtk-04a73b
Common Procurement VocabularyLift installation work
Procurement MethodOpen procedure
Value£234,000
« Previous Page

No location provided

Category Works

Type

No. of Lots 1

Status Active

Published 9th Oct 2024

Tender Details
Referenceocds-h6vhtk-04a73b
Common Procurement VocabularyLift installation work
Procurement MethodOpen procedure
Value£234,000

Section I: Contracting authority

I.1) Name and addresses

NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust)

Ty Gorwel, Building 14, St David鈥檚 Park, Job鈥檚 Well Road

Carmarthen

SA31 3BB

Contact

Josh Wood

Email

josh.wood [at] wales.nhs.uk

Country

United Kingdom

NUTS code

UK - United Kingdom

Internet address(es)

Main address

Buyer's address

I.2) Information about joint procurement

The contract is awarded by a central purchasing body

I.3) Communication

The procurement documents are available for unrestricted and full direct access, free of charge, at

Additional information can be obtained from the above-mentioned address

Tenders or requests to participate must be submitted electronically via

Electronic communication requires the use of tools and devices that are not generally available. Unrestricted and full direct access to these tools and devices is possible, free of charge, at

I.4) Type of the contracting authority

Body governed by public law

I.5) Main activity

Health


Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Replacement Lift within Ward Four (4) at Glangwili General Hospital (GGH)

Reference number

P0246 - HDD-OJEU-57215

II.1.2) Main CPV code

  • 45313100 - Lift installation work

II.1.3) Type of contract

Works

II.1.4) Short description

Hywel Dda University Health Board (HDUHB) have a requirenment to replace the existing lift within ward four (4) at Glangwili General Hospital (GGH).

The works required are comprised of the dismantling and removal of the existing lift equipment, followed by the design, manufacture, supply, construction, installation, and commissioning of one (1) traction machine-room-less (MRL) stretcher passenger lift enhanced with bed passenger lift features.

The requirement shall be in place for one (1) year and five (5) months which includes a twelve (12) month warranty / maintenance period following the successful installation and handover of the new lift. Upon the conclusion of this maintenance period, the All-Wales lift maintenance provider will complete an inspection of the lift and absorb it into its contract portfolio.

Scope of the Contract

HDUHB are seeking to appoint a suitably qualified lift supplier to facilitate the replacement of the vertical transportation (VT) unit at GGH. The VT system must comprise of the following:

- A simplex, 20 persons / 1500kg Traction MRL Trolley / Stretcher Lift with a rated speed of 1.0m/s, spanning 4 levels which shall be designed, manufactured and installed in compliance with the requirements of Welsh Health Technical Memorandum (WHTM): Lifts (WHTM08-02: 2017) where existing design constraints allow.

- The existing lift is used to carry hospital beds. Its current dimensions are larger than the WHTM definition of a Trolley / Stretcher Lift. The New Lift will need to meet the existing dimensions and duty load as a minimum. For this reason, some features of the WHTM Bed lift specification will be necessary and incorporated into the design specification.

- The hospital site operates entirely on essential power. This means the supply power to the lift will be fed from a generator periodically. The supplier should allow for this in their design submission.

The Lift Contractor shall ensure that the design, manufacture, construction and installation of the lifts is undertaken in full compliance with the requirements of the Lifts Regulations 2016.

II.1.5) Estimated total value

Value excluding VAT: 拢234,000

II.1.6) Information about lots

This contract is divided into lots: No

II.2) Description

II.2.2) Additional CPV code(s)

  • 42416100 - Lifts
  • 50750000 - Lift-maintenance services

II.2.3) Place of performance

NUTS codes
  • UKL1 - West Wales and the Valleys

II.2.4) Description of the procurement

Hywel Dda University Health Board (HDUHB) have a requirement to replace the existing lift within ward four (4) at Glangwili General Hospital (GGH).

The works required are comprised of the dismantling and removal of the existing lift equipment, followed by the design, manufacture, supply, construction, installation, and commissioning of one (1) traction machine-room-less (MRL) stretcher passenger lift enhanced with bed passenger lift features.

The requirement shall be in place for one (1) year and five (5) months which includes a twelve (12) month warranty / maintenance period following the successful installation and handover of the new lift. Upon the conclusion of this maintenance period, the All-Wales lift maintenance provider will complete an inspection of the lift and absorb it into its contract portfolio.

Scope of the Contract

HDUHB are seeking to appoint a suitably qualified lift supplier to facilitate the replacement of the vertical transportation (VT) unit at GGH. The VT system must comprise of the following:

- A simplex, 20 persons / 1500kg Traction MRL Trolley / Stretcher Lift with a rated speed of 1.0m/s, spanning 4 levels which shall be designed, manufactured and installed in compliance with the requirements of Welsh Health Technical Memorandum (WHTM): Lifts (WHTM08-02: 2017) where existing design constraints allow.

- The existing lift is used to carry hospital beds. Its current dimensions are larger than the WHTM definition of a Trolley / Stretcher Lift. The New Lift will need to meet the existing dimensions and duty load as a minimum. For this reason, some features of the WHTM Bed lift specification will be necessary and incorporated into the design specification.

- The hospital site operates entirely on essential power. This means the supply power to the lift will be fed from a generator periodically. The supplier should allow for this in their design submission.

The Lift Contractor shall ensure that the design, manufacture, construction and installation of the lifts is undertaken in full compliance with the requirements of the Lifts Regulations 2016.

II.2.5) Award criteria

Price is not the only award criterion and all criteria are stated only in the procurement documents

II.2.7) Duration of the contract, framework agreement or dynamic purchasing system

Duration in months

17

This contract is subject to renewal

No

II.2.10) Information about variants

Variants will be accepted: No

II.2.11) Information about options

Options: No

II.2.13) Information about European Union Funds

The procurement is related to a project and/or programme financed by European Union funds: No


Section III. Legal, economic, financial and technical information

III.1) Conditions for participation

III.1.2) Economic and financial standing

Selection criteria as stated in the procurement documents

III.1.3) Technical and professional ability

Selection criteria as stated in the procurement documents

III.2) Conditions related to the contract

III.2.2) Contract performance conditions

One (1) Year and Five (5) Months Term.

III.2.3) Information about staff responsible for the performance of the contract

Obligation to indicate the names and professional qualifications of the staff assigned to performing the contract


Section IV. Procedure

IV.1) Description

IV.1.1) Type of procedure

Open procedure

IV.1.8) Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

IV.2) Administrative information

IV.2.2) Time limit for receipt of tenders or requests to participate

Date

8 November 2024

Local time

12:00pm

IV.2.4) Languages in which tenders or requests to participate may be submitted

English, Welsh

IV.2.6) Minimum time frame during which the tenderer must maintain the tender

Duration in months: 4 (from the date stated for receipt of tender)

IV.2.7) Conditions for opening of tenders

Date

8 November 2024

Local time

12:00pm


Section VI. Complementary information

VI.1) Information about recurrence

This is a recurrent procurement: No

VI.2) Information about electronic workflows

Electronic ordering will be used

Electronic invoicing will be accepted

Electronic payment will be used

VI.3) Additional information

NOTE: The authority is using eTenderwales to carry out this procurement process. To obtain further information record your interest on Sell2Wales at

The Contractor shall ensure that all contracts with Subcontractors and Suppliers which the Contractor intends to procure following the Award date, and which the Contractor has not, before the date of this Contract, already planned to award to a particular Subcontractor or Supplier, are advertised through the Sell2Wales portal () and awarded following a fair, open, transparent and competitive process proportionate to the nature and value of the contract.

Under the terms of this contract the successful supplier(s) will be required to deliver Community Benefits in support of the authority鈥檚 economic and social objectives. Accordingly, contract performance conditions may relate in particular to social and environmental considerations. The Community Benefits included in this contract are:

Contribution to the Well-being of Future Generations Act and Social Value Questions are included in the tender pack.

(WA Ref:145090)

The buyer considers that this contract is suitable for consortia.

VI.4) Procedures for review

VI.4.1) Review body

High Court

Royal Courts of Justice, The Strand

London

WC2A 2LL

Telephone

+44 2079477501

Country

United Kingdom