Based at the Vantage Point campus in Paignton, the new purpose-built facility is planned to open to students in September 2019.
The college is investing 拢17m in the new centre, which will have zones for creative and 聽technical design including computer-aided design (CAD) and computer-aided manufacturing (CAM) facilities, along with design suites and zones for more traditional activities such as classrooms and lecture theatres.
Got a story? Email news@theconstructionindex.co.uk