海角社区app

海角社区app

Tue September 24 2024

Related Information

Singapore awards engineering contract for mega-sewer

4 Jun 14 Singapore’s national water agency, PUB, has appointed a joint venture between Black & Veatch and Aecom to provide engineering services for a scheme that includes more than 18 miles of tunnelling and a 7.5-mile outfall.

The joint venture team will work with PUB to shape the second phase of the Deep Tunnel Sewerage System (DTSS). DTSS Phase 2 will extend DTSS to the western side of Singapore through an 18.6-mile-long tunnel, nearly 44 miles of link sewers, the Tuas Water Reclamation Plant (WRP) and an estimated 7.5-mile deep-sea outfall. The overall DTSS will result in a 50% reduction in land taken by used-water infrastructure with three centralized collection and treatment points: Changi WRP in the east; Kranji WRP in the north; and Tuas WRP in the west.

鈥淭he project鈥檚 vision underlines PUB鈥檚 innovation and global leadership in sustainable water solutions,鈥 said Cindy Wallis-Lage, president of Black & Veatch鈥檚 water business. 鈥淚t is a privilege to team with Aecom and PUB in setting a new standard in reliable, flexible and energy-efficient infrastructure that promotes water sustainability for the future.鈥

鈥淲e have assembled a compelling joint venture team of world-class local and global experts, who look forward to delivering a sustainable infrastructure solution,鈥 said Michael Burke, Aecom president and chief executive officer. 鈥淲e are honoured to be a part of the DTSS project, which will enhance Singapore鈥檚 water sustainability and resilience 鈥 solidifying its place as a leader in the global water industry.鈥

Related Information

A water production facility will be integrated with the Tuas WRP and an integrated waste management facility will be co-located at the site. This offers potential opportunities to integrate used-water and solid-waste treatments to maximise energy and resource recovery.

The Black & Veatch and Aecom joint venture will conduct a feasibility study and preliminary design as part of the first stage of the project. As the lead consultant, the team will programme manage the delivery of DTSS Phase 2 in the second stage of the project. Supporting Black & Veatch and Aecom will be Ramboll.

Got a story? Email news@theconstructionindex.co.uk

MPU
MPU

Click here to view latest construction news »