Rail contractors still failing to learn lessons

1 Sep 22 The official investigation into a collision between two road-rail vehicles has revealed that railway contractors are continuing to repeat potentially fatal errors.

The stationary platform basket was hit by the RRV crane travelling at 12mph
The stationary platform basket was hit by the RRV crane travelling at 12mph

The Rail Accident Investigation Branch has published the findings of its investigation into an incident that took place on the tracks near Billericay in Essex last year.

On the 2nd May 2021 at around 7am, while travelling on the same track towards Wickford station from a location of work near Ramsden Bellhouse, a stationary mobile elevating work platform (MEWP) road rail vehicle (RRV) was struck by the jib of a 360o crane RRV which had been travelling behind it at 7.5mph. The MEWP operator, in the basket at the time, suffered life-changing injuries due to the collision.

Around 10 seconds before the collision, the MEWP operator had stopped to stow away a tool which was loose in the basket. Around the same time, the operator of the crane became dazzled by the rising sun ahead. The crane operator turned to look out of the side window to relieve his eyes but did not apply the brakes of the crane when he did so, resulting in the collision with the MEWP.

Before the collision, the crane operator had allowed the gap between the crane and the MEWP to reduce so that, when the MEWP stopped, it was only about 30 metres. Network Rail standards require operators to maintain a minimum separation distance of 100 metres when travelling in convoy with other vehicles. The shortened separation distance in this case reduced the time that the crane operator had to observe and react to the obstruction ahead.

Fatigue was a possible factor in this accident, the RAIB said, as the crane operator had not taken advantage of the opportunity to rest before the nightshift at a hotel provided by his employers. He had also not declared his actual travel time when providing his journey details at the site access control point.

A possible underlying factor was the lack of clarity in the role of machine controllers during travelling movements, RAIB added. This may have contributed to a lack of warning of the impending collision from the crane controller, who was riding in the cab with the crane operator.

A similar collision occurred at Wellingborough on 15th August 2019. The industry鈥檚 investigation into that accident found that the machine operators involved had been regularly ignoring the need to maintain an adequate separation between vehicles. Although action was taken to modify behaviours, site inspection procedures were not revised to assure compliance and RAIB found that the plan for the work being undertaken on 1st to 2nd May 2021 did not explicitly cover the need for suitable distances to be maintained. Not applying learning from this previous accident is also a possible underlying factor, RAIB said.

J Murphy & Sons was Network Rail鈥檚 principal contractor on the job, renewing overhead lines. Murphy subcontracted work packages to SPL Powerlines, including the one undertaken by the group involved in this incident.

SPL supplied the two MEWPs and employed the MEWP controller, crane controller and the MEWP operators. SPL was also responsible for meeting the requirements of the on-track plant operations scheme (POS) and providing the representative on site for the scheme (POS representative). Readypower Rail Services (RRS) supplied the crane and employed its operator.

Related Information

RAIB recommendations

RAIB has made three recommendations. Two of these are addressed to Network Rail and include the need to clarify the role of a machine controller when they are travelling with their vehicle, as well as the need to continue the development of obstacle detection for road-rail vehicles. A third recommendation is made to SPL Powerlines UK and Readypower Rail Services relating to the application of learning from previous accidents and incidents.

RAIB has also identified four learning points. These alert operators to the need for bringing vehicles to a stand when forward vision is lost, and the importance of judging and observing the correct safe distance between moving vehicles. It is also important that staff are fit and appropriately prepared when reporting for duty and comply with all road-rail vehicle operating instructions.

Andrew Hall, chief inspector of rail accidents said: 鈥淪adly, this readily-avoided accident led to a member of railway staff sustaining life changing injuries. Bright sunlight can temporarily dazzle or obscure vision. It is important that those driving vehicles by line of sight, slow sufficiently or stop if visibility becomes poor. Even momentary dazzling can lead to an unsafe situation rapidly developing.

鈥淲hen operating rail-road machines on the railway it is essential to maintain the defined safe distance of 100 metres with other moving vehicles. This accident involved differential speeds dangerously reducing the distance between the vehicles from 90 metres to approximately 30 metres during the journey. Recognising the true distances involved, as well as the potential consequence of road-rail vehicles travelling in convoy at different speeds, is vital to maintaining safe distances between vehicles.

鈥淲hat is particularly frustrating about this accident is that lessons from a previous accident involving the same contractor had not been learned. Both accidents shared similar factors including a lack of adequate separation between vehicles, a loss of attention and avoiding action not being taken. Not applying these lessons to improve planning of work or the site assurance processes was an opportunity missed to avoid a collision with severe consequences.鈥

The full report can be found at

Got a story? Email news@theconstructionindex.co.uk