With production output at Gurney Slade increasing, Morris & Perry needed another large capacity hauler.
鈥淲e needed to add an articulated hauler, as opposed to another rigid truck,鈥 said assistant quarry manager Oliver Dormer, 鈥渢o assist in overburden removal and managing waste material in areas of the quarry where a rigid simply won鈥檛 go as well as hauling prime material from the face.鈥
He continued: 鈥淲e boiled our choice down to two manufacturers and settled on the Volvo A45G following a very successful demonstration and it鈥檚 already proving to be a good decision.
鈥淥n average, we are saving 70 litres of fuel per shift compared to our resident rigid haulers, even though the A45G is carrying the same payload,鈥 Mr Dormer said.
Got a story? Email news@theconstructionindex.co.uk