The Bell B50Ds have been working in quarries, hauling loads in excess of 6km.
鈥淭hese Bell B50Ds have been performing very well so far,鈥 said director Rob Stark, four months after their delivery, 鈥渉auling their designed loads at fast speeds, up and down the steep quarry gradients.鈥
He added: 鈥淭heir load capacity, combined with an impressively low fuel consumption, are already making the model 鈥榦ne to watch鈥 within our fleet, particularly in terms of cost effectiveness.鈥
Got a story? Email news@theconstructionindex.co.uk