Architect Watson Batty has drawn up plans for client Places for People that will see the existing 23,400 sq ft facility demolished and replaced with a 41,000 sq ft building.
The new building will have the Surrey town鈥檚 first public swimming pool, with eight 25-metre lanes, movable floor and spectator seating. There will also be a 10-metre learner pool with moveable floor, a four-court sports hall, 110-station fitness suite, exercise studios, indoor cycling studio and a two-storey healthy suite with sauna, steam rooms and wet and dry treatment rooms.
A new cr猫che and children鈥檚 adventure play area are also provided alongside a caf茅, linked with external elevated and ground level terraces.聽
Outside will be six 3G five-a-side football pitches, a full sized synthetic turf pitch and full-size football grass pitch.聽 Improvements are also made to parking provisions and access to the site.
Watson Batty regional director Rima Yousif said: 鈥淢odern technologies, high quality and low maintenance materials will be utilised throughout the building, which allows natural light into the heart of the new facility through new roof features.鈥
Got a story? Email news@theconstructionindex.co.uk